top of page

Integration inverters
SAJ

The following steps are described in detail:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

Registration in SAJ

If you do not yet have an account in the SAJ portal, register at the following link:
https://eop.saj-electric.com/login

 

Creation of Developer Account

Using the same email address with which you manage the plants, create an account in the SAJ Developer Portal: https://developer.saj-electric.com/login

​

API Access Request
Send an email to consulta@saj-electric.com requesting access to the API.
Make sure to include in the message the serial number of at least one SAJ inverter linked to your account so they can correctly identify it.
You will then need to go to https://eop.saj-electric.com/login to continue with the API request.

​​

Obtaining the Developer ID
Once access has been enabled, go to the Developer Portal: https://developer.saj-electric.com/login
There you will see an exclamation mark icon indicating your Developer ID. Copy it, as you will need it later.

​

​

​

​

​

​

​

​

​

​

​​​​​

​

​Log back into the portal through the following link: https://eop.saj-electric.com/login

Once inside, go to the top of the screen and click on the API icon.

Select the option “Third Party Account.”

Paste your Developer ID into the corresponding field to complete the access setup.

​

​

​

​

​

​

​

​

​

​

​

​

​

 

​

​

​

​

​

​

​

​

​

​

​

​

Linking with a Developer
Select the option “Select third party developers” and paste the Developer ID you copied previously from the Developer Portal.​

​​

​

​

​

​​

​

​

​

​

​

​

​

​

​

Linking Request
Wait until the button “Apply for binding” appears in the Operation column.
Click on it, and then press “Start configuration” to officially submit the request.

​​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Data Processing Authorization
Accept the data processing conditions to proceed.

​

Authorization Letter
Download the template “Authorization Letter of Distributor/Installer to Developer”, sign it, and upload it back to the portal.
SAJ will review the documentation and approve the request if everything is correct.

​

​

​

​

​

​

​​

​

​

​

​

​

​​

​

​

​

​

​

​

​

​

​Contract Approval
Validation usually takes about 3 business days.

​​

System Management in the SAJ Portal
Go back to SAJ Portal (https://eop.saj-electric.com/login).

Select the distributor and save.

Log in again and, in the plant list, mark the plants you want to enable for the API. Save the changes.

​​

Application Creation in Developer Portal
Go to Developer Portal (https://developer.saj-electric.com/login).

  1. Navigate to Console > App > Create an App.

  2. Once created, locate it in the list and click “Enter” in the Operations column.

  3. Go to Settings and Development > App Configuration.

Copy your App ID.

In Development Configuration, generate and save your Secret ID.

In Apply for Release, click Submit for review.

​

​​

​

​

​

​

​

​

​

​

​

​

​

​

​

​​

Integration with Sentinel
Once your request is approved, log in to Sentinel and follow these steps to start synchronization:

Go to Settings > Integrations > Add new (+).

Select the SAJ logo and enter the App ID and Secret ID you copied earlier.

 

Automatic Synchronization
After entering your SAJ API credentials in Sentinel, data synchronization will be carried out automatically overnight.
You will need to wait until the next morning to view your photovoltaic plants in Sentinel Solar.​​​​​​​​​

Captura de pantalla 2025-08-27 a les 14.33.32.png
Captura de pantalla 2025-08-27 a les 15.08.12.png
Captura de pantalla 2025-08-27 a les 15.14.04.png
Captura de pantalla 2025-08-27 a les 15.16.23.png
Captura de pantalla 2025-08-27 a les 15.24.12.png
Captura de pantalla 2025-08-27 a les 15.26.57.png
Captura de pantalla 2025-08-27 a les 15.37.43.png
bottom of page